![]() |
The National 2½" Gauge Association |
![]() |
| Keeping the spirit of the past alive for tomorrow and looking to the future | ||
| The National 2½" Gauge Association is a not-for-profit organisation | ||
Notes on the Design
This project was originally started by Clive Young but has now been taken over by the Association. It has been drawn using 3D CAD. Please note that this is a project aimed at the more experienced builder and not really suitable for beginners although it could be simplified somewhat
This is a large and powerful locomotive for 2½" Gauge so should pull a few passengers easily.
The loco has been designed using metric dimensions to try and appeal to the younger generation of model engineers, many of whom have had little or no experience of the old imperial system.
The locomotive has been mostly designed from the full size works drawings for LEW and where possible the model has been kept close to scale. Although LYD is based on the original LEW drawings, several features of the design were changed. For instance, the pony truck design was altered for LYD to improve the running and stability. I did manage to get copies of the drawings for the new truck design but they lack dimensions and detail. However, I have 'cobbled' something up using photos from the book on LYD and photos online which looks something like. Fortunately, the new truck design is considerably easier to build than the ones fitted to Lew which used complicated castings. The amount of detail to include is left up to the individual builder and the design can be simplified somewhat. The Vacuum Brake cylinders are described with working pistons incase anyone wishes to make them fully operational but they can be left as dummies if not.LYD itself has gone through several changes since it was originally built. The boiler was originally oil fired with the oil tanks in what are now the coal bunkers but was soon converted to coal firing.
The boiler is a conventional design with twin radiant superheaters but using rod crown stays instead of girder stays. The flanged plates have generous radii on them so should be easy to form. Water feed will be by twin axle pumps and a hand pump in one of the coal bunkers. This gives easy access to the pump which is always difficult if it is fitted in one of the side tanks. Details for fitting an injector will be given if required.
I have drawn up a different type of regulator based on the design by Gordon Smith which is simple to make and should work better than the usual vertical sliding type which rarely seal properly, especially against hydraulic test pressure.The original loco is fitted with two backhead mounted combination injectors and no other boiler clacks. To keep scale appearance the combination injectors can be made dummies but containing clacks for feeding the water from the hand pump and axle pumps into the boiler. Much simpler conventional clacks could be fitted instead of the dummy injectors if scale appearance is not important. Internal pipes are fitted to carry the cold water to the front of the boiler rather than feed it straight into the backhead.
If it is intended to fit an injector this complicates things. It is possible to use one of the dummy combination injectors/clack valve for the injector feed and the other used for the handpump and axle pumps combined. A better solution is to fit a dual top feed to the boiler barrel hidden inside the rear sandbox. The feed pipes will be concealed behind the side tanks. The hand pump and axle pumps can feed into this leaving the backhead clack/s for injector feeds.The original LEW had only a single water gauge fitted to the LH side of the backhead but LYD is fitted with two. Both can be fitted but the RH one necessitates a revised handle for opening the sliding fire doors.
LEW had a small steam turret mounted onto the top of the firebox towards the front which had the blower valve, whistle and pressure gauge feed mounted on it. On LYD this has been replaced with a turret combined with the safety valves. This has three steam valves fitted, one for the blower valve, one for the injector steam valve and the third for the whistle valve.
The original LEW locomotive had two tank mounted water valves for the injectors but LYD does not have these. Instead, there are two water valves mounted under the cab floor? The handle for the RH valve is just behind the firebox and so can be conveniently used for the axle pump bypass valve without it looking out of place. An injector water valve could be fitted to the LH side under the running boards with the water feed taken from the LH tank. It could be mounted out of sight inside the frames with a linkage to the side of the cab to operate it but that complicates things. However, a better option would be to have the injector fed from a separate tank on the driving truck as the water in side tanks usually gets warm which prevents the injector from working. The injector water valve can then be fitted to the driving truck. The actual position of the injector is left to the builder. A convenient position would be behind the LH cab steps outside of the frames but would not look prototypical. It can be mounted inside the frames which would look better but makes access not so easy.
From photographs, the fixings for the cab upper half, the bottom of the bunkers and the bunkers to the side tanks appear to be csk socket head bolts. Some of them in the bunker to side tank jointing strip appear to be missing! Presumably, this is for easier removal of the cab etc. when necessary. It is unlikely that 'scale' sized socket head screws will be available (the smallest seem to be M2 which have 4mm diameter heads) so use rivets or conventional csk head screws instead.
It will be necessary to make the top half of the rear cab sheet and part of the roof removable to enable driving of the locomotive to be carried out easily.
Dimensions:
Scale factor for 2.5" gauge = 32.426mm to the foot
Overall length - 745mm over buffer beams
Overall width - 215mm
Height to top of chimney - 290mm
Cylinder bore - 28.5mm
Cylinder Stroke - 43mm
Driving Wheel diameter - 88mm
Water feeds:
2 axle pumps of 8mm bore by 8mm stroke.
1 emergency hand pump of 12mm bore by 25mm stroke fitted inside the RH coal bunker.
Option of 1 or 2 injectors
Weight - ?
44 sheets of A1 size and 4 sheets of A2 size
Sheet 1 - LH View
Sheet 1A - RH View
Sheet 1B - Isometric View
Sheet 2 - Front and Rear View
Sheet 3 - Top and Bottom View
Sheet 4 - Frame Assembly
Sheet 5 - Rolling Chassis Assembly
Sheet 6 - Frame Plate Details
Sheet 7 - Frame Details 1
Sheet 8 - Frame Details 2
Sheet 9 - Frame Details 3, Wheels and Axles
Sheet 10 - Brake Details
Sheet 11 - Pony Truck Details
Sheet 12 - Pony Truck Assembly Details
Sheet 13 - Cylinder Details
Sheet 14 - Cylinder and Misc. Cylinder Details
Sheet 15 - Cylinder Drain Cock Details
Sheet 16 - Slidebar Brackets
Sheet 17 - Coupling and Connecting Rods, Crossheads
Sheet 18 - Joy Valve Gear Arrangement
Sheet 19 - Joy Valve Gear Details
Sheet 20 - Steam and Exhaust Connections, Lubricator
Sheet 21 - Boiler Assembly
Sheet 22 - Boiler Details 1
Sheet 23 - Boiler Details 2
Sheet 24 - Regulator and Superheater
Sheet 25 - Grate, Ashpan and Firedoor
Sheet 26 - Safety Valve and Steam Manifolds
Sheet 27 - Boiler Fittings
Sheet 28 - Smokebox Details
Sheet 29 - Boiler Cleading
Sheet 30 - Footplates
Sheet 31 - Side Tank Arrangements
Sheet 32 - Side Tank Details
Sheet 33 - Coal Bunkers
Sheet 34 - Coal Bunker Details
Sheet 35 - Cab Assembly
Sheet 36 - Cab Details 1
Sheet 37 - Cab Details 2
Sheet 38 - Cab Details 3
Sheet 39 - Cab Layout
Sheet 40 - Sanding Gear
Sheet 41 - Cow Catcher and Coupling Hook
Sheet 42 - Dummy Lubricators
Sheet 43 - Dummy Vacuum Ejector
Sheet 44 - Vacuum Pipes and Vacuum Resevoir
Sheet 45 - Hand Pump, Whistle and Slidebar Protectors
Sheet 46 - Nameplates and Lettering
Click here for sample drawingsDriving Wheels and Pony Truck Wheels to order. Other castings in preparation
Laser Cut parts for the frames etc. will be available from Model Engineers Laser and some parts will be available 3D printed to order in stainless steel
This page was last updated on 29/09/2025